Gwadar port fully operational now: Asim Bajwa

295

GWADAR: CPEC Chairman  Asim Saleem Bajwa has said that Gwadar port has been made fully operational.

Asim Saleem Bajwa while talking to media in Gwadar on Monday said that traffic at Gwadar port is increasing and four berths will be operational at the port.

He said that Gwadar port has been made fully operational and 24,000 tonne ship from Australia will be anchored at the port.

Bajwa said that now the port is preparing for Phase II and development work on it is going on at a fast pace while online booking can be done for delivery of goods.

He said that Gwadar port is a reality. A hospital is being built in the city with the cooperation of China and the master plan of Gwadar City has also been approved.